Quetta Serena Hotel
Problem:
Quetta Serena Hotel faced several issues with its old LV panels and electrical distribution systems. These were installed in 1985 with their accessories outdated, not meeting international standard protocols which posed a safety risk as it was unable to meet the modern load of 200-250 KW,
Requirements:
Installation of New LV panels, Synchronization of Generators, SCADA monitoring, installation of BTD, and Installation of new MV panels to upgrade the Electrical distribution system.
Solution:
Designed and installed LV Panels that improved the electrical distribution system of Serena Hotel drastically.